Rough Grading vs. Finish Grading

Two different stages with different tolerances, equipment and end results.

Excavation decisions are easier when the scope is translated into the actual site conditions, quantities and finished result. This guide is written for Sarnia-Lambton property owners, builders and project buyers preparing to speak with contractors.

What to account for

  • Two different stages with different tolerances, equipment and end results.
  • Define the finished result before work begins
  • Confirm access and buried utilities
  • Plan material handling and haul-off
  • Include backfill, compaction or restoration where needed
  • Use a written scope when comparing contractors

Questions to put in the written quote

  • What excavation and material handling is included?
  • What is excluded or priced as an allowance?
  • Who handles locates, permits or approvals that apply?
  • Is haul-off included? Where will material go?
  • What backfill, aggregate, compaction and grading are included?
  • What condition will the site be left in when the excavation crew is done?
Use the guide as a scoping tool, not a substitute for a site assessment. Excavation prices and methods can change materially with access, soil, water, depth, disposal and the end use of the site.